Go West, Berlin (D)
Go West, Berlin (D)

Go West, Berlin (D)

The offices as well as the training rooms are heated and cooled via TABS (thermo active concrete ceiling). In building area 8, the CO2-controlled ventilation wings in the facade are ventilating hygienic and naturally during summer at moderate outdoor temperatures. In construction site 11, ventilation is provided with a mechanical ventilation system with heat and moisture recovery. The energy supply heating is ensured by decentralized air/water heat pumps (reversible) in combination with gas condensing boilers for peak load coverage. The cold supply is provided by dry and adiabatic (sprayed) recoolers/chillers at moderate summer temperatures, which is supplied with rainwater/roof water. At high outside temperatures, we switch to cold compression mode.